How testing runs, start to finish
Send the postcode, the number of plots and the construction types: new build or conversion, houses or flats. We confirm how many test sets Approved Document E actually requires, agree a fixed fee the same day, and book the visit into your programme close to completion. Before we arrive, the rooms need to be testable: separating walls and floors finished, doors and windows fitted and closable, sockets and switches in, rooms clear enough to work in, and no soft floor coverings on floors due an impact test.
On the day, airborne tests put a loudspeaker in the source room and measure the level difference across the separating wall or floor, corrected for reverberation and background, to give DnT,w + Ctr. Impact tests run a standardised tapping machine on the floor above and measure what arrives in the room below, giving L'nT,w. Both follow the BS EN ISO 16283 field methods, and Approved Document E's sampling rule (at least one set of tests for every ten dwellings in each group or sub-group of constructions) sets how many rooms we test. We'll tell you the exact count up front so you don't pay for tests you don't need.
Results are checked against the Approved Document E performance standards on site, and certificates suitable for building control (and for your BREEAM assessor) land within five working days of the visit. If an element falls short, you get practical remedial advice aimed at the likely cause, then a retest once the fix is in.