Design stage to post-construction, without the drama
The best time to appoint us is when the pre-assessment is being scored, at RIBA Stage 2 or 3. We confirm which acoustic credits the scheme can realistically achieve, then fix the performance criteria for the building type: BS 8233:2014 for offices, BB93:2015 for schools, HTM 08-01 for healthcare. BREEAM expects this work from a suitably qualified acoustician, and that's what you get: a corporate member of the Institute of Acoustics with a decade of building acoustics behind him.
Through design development we review layouts, separating constructions and building services against those criteria, and flag any gap while it costs a drawing revision rather than a remedial package. For Pol 05, we run the BS 4142 plant noise assessment against the background sound level at the nearest noise-sensitive premises, before the plant is ordered, so attenuation is a selection decision rather than a retrofit. Everything is issued in terms the design team can act on: constructions, selections, details.
At completion we measure sound insulation, indoor ambient noise and reverberation time in the finished spaces, and the report lands within five working days of the survey. The evidence pack is cross-referenced to the credit criteria, so your assessor can file it without a follow-up question. WELL projects run the same way: design review against the Sound concept features, then measurement for performance verification.





